INDIANAPOLIS — IndyGo would like to inform riders and motorists that the final stage of Red Line enhancement work will begin on or after Monday, Aug. 7. This work along College Avenue, happening between Kessler Boulevard and Broad Ripple Avenue, will include bus pad reinforcement and concrete pouring on the Broad Ripple station. These improvements will continue through late August.

Vehicular traffic will be detoured around the station closures using Westfield Boulevard, Central Avenue and Kessler Boulevard. Local access will be maintained in this segment despite through traffic being closed. Residents along the detour route can expect increased bus and motorist traffic. (See motorist detour map below.)

For riders, the Broad Ripple Red Line station on College Avenue will be closed. North and southbound service will be available at temporary stops near the intersection at Westfield Boulevard and College Avenue. (See rider map below.)

As a reminder, IndyGo is making these significant improvements to the Red Line to provide additional long-term stability and protect the significant investment made in the system’s infrastructure. Work is expected to be complete by August 2023.

For more information about the project, and to sign up to receive weekly updates, visit IndyGo’s website here.

(Motorist Detour Map)

(Rider Detour Map)

###

Connect With IndyGo

Upcoming Events

Our Current Projects